VI. ENVIRONMENTAL CORRECTION: Don't ignore that 0.95


Article 4.4.1.1 of JB / T 10303-2020 specifies the standard reference conditions for units:


* Absolute atmospheric pressure 100 kpa


* Environmental air temperature 25℃


* Relative humidity 30%


Under this condition, the unit only outputs the rated power. When conditions are worse, they must be fixed. Article 4.4.3 requires that when the actual working conditions are worse than the baseline conditions, the power of the genset of the non-boosted and mechanically boosted diesel engine shall be converted to the power of a diesel engine under the test conditions in accordance with GB / T 6072.1 and then converted to electrical power, and shall not exceed the rated power of the generator.


The 15D202-2 Atlas gives the correct way to:


P _ Actual = P _ Rated × C


Where C is the correction factor for the table by altitude and atmospheric temperature. Excerpts of some data:


Elevation (m)Atmospheric pressure (kpa)25℃30℃35℃40℃45℃
0101.31.000.990.950.900.85
20098.91.000.970.930.880.83
40096.71.000.950.910.860.82
60094.40.980.93

0.89

0.840.80
80092.10.960.910.870.830.78
100089.90.940.900.850.810.76
150084.50.890.850.810.760.72
200079.40.840.800.760.720.68
250074.60.760.720.680.640.59
300070.10.680.680.640.600.56
400061.50.600.600.560.520.48


Article 4.4.4 of JB/T 10303-2020 also adds a detail: When the test altitude exceeds 1000m (but does not exceed 4000m), the upper limit of the environmental temperature is corrected by reducing 0.5℃ for every 100m increase in altitude.


VII. Four types of nuclear cores to be selected for landin


Having counted capacity does not mean having chosen it, and it still has to pass four stages.


1 Load rate calibration: 15% ~ 85%


15D202-2 Article 7.1: The load rate of the diesel generating unit in long-term operation should not be less than 15%, and should not be higher than 85%.


The lower limit of 15% is not set at random. Long-term low load operation will lead to insufficient combustion room temperature, poor fuel vapourization, carbon deposits in the cylinder,  oil dilution, commonly known in the industry as "wet accumulation." Article 7.4.1 (a) of GB / T 29328-2018 also specifies:


The domestic emergency diesel generator set should not be operated at low load (< 30% load) for a long time and should not be stopped frequently.


These two lines are not contradictory: 15% is a bottom line "never below" for a long time, and 30% is an engineering experience value "not recommended below." 

When selecting a model, the upper limit of 85% is reversed, and daily life is guaranteed to be most comfortable in the 40% to 80% range.


2 Maximum unit capacity

 

GB 51348-2019 Article 6.1.3, paragraph 8: The single-unit capacity of the diesel generating unit, the frontal voltage of 3kV ~ 10kV should not exceed 2400 kW, and the voltage below 1kV should not exceed 1600 kW.


Above this number, high-pressure units or multiple machines must be considered.


3 Number of parallel machines and total capacity


GB 51348-2019 Paragraph 1 of Article 6.1.3: The number of emergency firewood power generating units should not exceed 4, and the standby units should not exceed 7; 

The total capacity of 230V / 400V units should not exceed 3000 kW after parallel.


4 Voltage Level Selection


15D202-2 to the criterion: the conditions should be selected low-voltage unit is the voltage drop to meet the requirements, only to low-voltage equipment power supply, not parallel or parallel after the total capacity of not more than 3200kW. The conditions for preferred high-voltage units are: low-voltage supply does not meet the voltage drop, high-voltage equipment needs to be supplied, and multiple high-capacity units are jointly connected.


Part 2 What size Genset Do You Need Power Sizing Formulas and Common Pitfalls


VIII. Gas Station Scenarios: Between Norm and Reality


Do gas industry peers, the most concerned is "my door station / storage and distribution station / LNG gasification station, in the end should be equipped with the motor, with how much."

 

GB 50028-2006 (2020 edition) is very restrained:


Article 6.5.20: The design of the power supply chain of the gate station and the storage and distribution station shall comply with the "secondary load" provisions of GB 50052.


Article 9.6.3: The design of the power supply chain of the liquefied natural gas gasification station shall comply with the "secondary load" provisions of GB 50052.

 

The text does not say "dual power must be used," but the text explaination gives a very practical sentence:

 

The power supply for the "tier two load" (powered by two-wire lines) requires that the safety of the gas supply be fully met in terms of power reliability. When it is difficult to use two-wire power supply, 

a separate power supply such as a gas or oil generator can be provided, which can greatly save investment and be operable.

 

This phrase actually gives a clear entry into compliance for your own generator: When the second line is difficult, replace it with a generator. This is often the most economical option for remote

 gate stations and mountain storage and distribution stations.


Another few things don't forget:


SceneRequirementBasis
Electrical installations in explosive hazardous places in stationsDesigned by GB 50058GB 50028 6.5.21
Explosive hazardous plant / installation area in the stationGas concentration detection alarm should be fittedGB 50028 6.5.21-3
Gas alarm systemThere should be backup power supplyGB 50028 10.8.2-6
SCADA main station roomHigh reliablity UPS should be installed and its spare equipmentGB 50028 6.8.15
Security Loads such as fire pumps, Accident Shut-off SystemsCapacity is at least met Total security load normal startupGB / T 29328 7.2.1


There is also a ratio requirement that is easily overlooked. Article 6.3.11 of GB 51348-2019: When the input power of the UPS is directly provided by the self-provided fuel generator, the ratio of its capacity to the fuel generator should not be less than 1: 1.2; The power supply time of the battery's initial installed capacity should not be less than 15 minutes.


That is, if you have a 100kVA UPS powered by a generator, the generator needs at least 120kVA of residual capacity for it - because the UPS is a rectifier load with a high power factor and high harmonics, the generator's "carrying capacity" is significantly discounted.


Switching times are also a point where plant stations are often stuck. GB 51348-2019 Article 6.1.8 paragraph 1:


Generators used for emergency power supply should normally be in a self-starting state. When the mains power is interrupted, the low-voltage generator should be supplied within 30 s, and the high-voltage generator should be supplied within 60 s.


GB / T 29328-2018 Appendix D Table D.1 The parameters given for diesel generators are more intuitive: capacity 2.5 ~ 2500kW, switching time 5s ~ 30s, continuous power 12h under standard conditions, generally more than 10 years, low cost but high operating cost, noise and vibration emission.


Article 15 By the way, the selection logic of article 7.3.1 of GB / T 29328-2018 is very straightforward:


  •   Security load allows power off time in milliseconds

      → static / dynamic energy storage UPS, online operation;


  •   Second Level

     → Quick self-starting generator unit with automatic switching;


  •   Level of Minute

        → The generator unit is ready and can be switched automatically or manually.


Part 2 What size Genset Do You Need Power Sizing Formulas and Common Pitfalls

 

Ⅸ seven high frequency error points


1 The power quota is not aligned. Use ESP data as PRP, or vice versa, 10% -20% difference. This is one of the most expensive mistakes.

 

2 The caliber of 2K and ΔE is not consistent. Back to the example above: K in SC2 is 7 (the corresponding bus allows a voltage drop of 15%), but E in SC3 is 0.2 (the allowable 20%).Strictly speaking, these two calibers should be unified - K = 5.5 should be taken by Δ E = 0.2.If K = 5.5, SC2 becomes 1318.24 kVA, still less than SC1's 1399.66 kVA, the conclusion is unchanged, but the calculation book itself is contradictory.Such cases where the "conclusions are fortunately correct and the process is not rigorous" are most likely to be picked up during the review of the drawings.

 

3 At the same time, the coefficient is repeatedly discounted. The load statistics have been multiplied by 0.9, so in the formula α must be taken 1.

 

4 The fire load is simple and complete.The "most unfavorable single point of fire" combination should be used to count only one fire zone plus one adjacent to it, and no building fire equipment should be stacked together.

 

5 The environmental correction is in the opposite direction. The demand capacity is divided by the correction factor, not multiplied.

 

6 Ignore the 1: 1.2 ratio of UPS. Stations with large loads of equipment such as machine rooms, communications and monitoring can increase capacity demand by 20%.

 

7 Look only at capacity, not load ratio. Calculate 900kW directly to buy 1000kW, the results of daily only 300kW, long-term operation below 30%, two or three years to overhaul.


Ⅹ Conclution


In this matter of generator selection, the difficulty is not the formula, but the working conditions to figure out:


What equipment is in operation during a fire? What must be secured when the city power goes out? How does the largest motor start? How high is the station at altitudes and how hot is it in the summer? What kind of power did the machine belong to? 


When these five questions are correct, capacity is naturally correct. The formula just translates them into numbers. 


A small suggestion: Make the above "three tables" (fire load tables, security load tables and capacity calculators) into an Excel template and fix the parameters with a drop-down and a formula. Only change the equipment list each time a new project is added. It is easy and does not flip over on the coefficients a, K, and ΔE.





Follow Us

WeChat

WeChat

Contact Us

Mob.: +86 134 8102 4441

Tel.: +86 771 5805 269

Fax: +86 771 5805 259

E-mail: dingbo@dieselgeneratortech.com

WhatsApp: +86 134 8102 4441

Add.: No. 10 Kechuang Road, High tech Zone, Nanning, Guangxi, China

Get in Touch

Enter your email and receive the latest news from us.

Copyright © Guangxi Dingbo Generator Set Manufacturing Co., Ltd. All Rights Reserved | Sitemap Update cookies preferences | privacy-policy
Contact Us