Part1 What Size Genset Do You Need Power Sizing Formulas and Common Pitfalls

Nov. 02, 2026

The size of the generator is the easiest part of the backup power station design, and the one that is most likely to "hit your head" and go wrong.


The setup is small, and the fire pump jumps as soon as it starts; The gearing was large, and the long-term low load operation caused carbon deposits in the cylinder, oil dilution, and fuel consumption to soar. After a few years, the machine was scrapped. What's even more troubling is that many people don't even know what kind of "power" the machine they buy is labeled.


This article covers methods, formulas, parameters, calculations, and pits at once.


Ⅰ  distinguish the four power types: this is the biggest pit of choice


The same generator set, the sample may write 1000kW, 1100kW, 1250kW three numbers, are not virtual standard - they refer to different power quotas.


According to Article 4.5.1 of JB / T 10303-2020, the unit output power quota is divided into four categories:


power typecodenameoperating methodyearly operating timekey constraints
continuous powerCOPa constant load operates continuouslyunrestrictedrun continuously each year with no time limit
base powerPRPvariable load continues to operateunrestrictedaverage output ≤70%PRP in 24h cycle
time-limited operating powerLTPrun when the load limit is changed≤500hup to 500h of operation at 100% LTP years
emergency backup powerESPrun when the road linit is changed≤200haverage ≤70% ESP for  24h, generally≤1h each time


This is the most common thunder on the scene: "1200kW" on the manufacturer's price list is probably ESP (emergency standby power). If you use it as a regular routine, it is equivalent to a long-term overload of 10% to 15% of the operation. In turn, you calculate the demand according to PRP, to choose an ESP 1200kW machine, the actual available capacity may only be 1000 kW.


Remember a sentence: the calculated capacity, be sure to ask the manufacturer "this number is COP, PRP or ESP," and use the same caliber.


  • JB/T 10303-2020 also adds a very pratical rule (Article 4.5.3) that when a unit is continuously operated beyond the specified time, its output power is converted into electrical power by 90% of the engine's specified power, but must not exceed the generator's rated power.


JB/T 10303-2020 4.2.2 clear: three-phase unit rated power factor 0.8 (lag), single-phase unit 0.9 or 0.1. So your KVA multiplied by 0.8 is KW, and this step is missing, and the power is 25% higher.


II. Algorithm Overview: Two steps to walk, three algorithms to take the larger


The entire configuration logic is actually two layers:


What size genset do you need power sizing formulas and commn pitfalls


The normatuve basis is clear. GB 51348-2019 Article 6.1.3 (2) provides that:

1. Programme and initial design phase

 The capacity of the emergency diesel generator set can be estimated at 10% to 20% of the total capacity of distribution transformers;


2. The construction plan design phase


3. The maximum capacity calculated by the following method should be determined: Calculate the generator capacity according to the stable load required to supply power; Calculated according to the maximum need for the activation of a single electric motor or group of electric motors; The voltage allowed to decrease by the generator's mother line when the motor is started and calculated;


4. Construction area of more than 1000 m2: 15~20W/m2;


5. Construction area below 10000m2: 10~15w/m2;


According to 10% to 20% of the distribution transformer capacity, the lower limit is taken from the large scale and the upper limit is took from the small scale.  

The estimated indicators are used only for research and programme phase quotations. When the construction plan comes up, the load count must be done honestly,  because the estimate does not reflect the decisive factor of "maximum single electric motor."


III. Step 1: How to calculate load statistics


The core is the need for coefficients:


P - js = K _ c * p _  e


Where P _ e is the equipment capacity (kW) and K _ c is the need factor. Divide it into inactivity by power factor, and then multiply it. Simultaneous coefficient get the total calculated load.


P _ s = K _ S * S P _ js


Two easily problematic details:


1 Need coefficients not to repeat discounts. If the mean coefficient has been multiplied by the load measurement, the "load mean coefficient α" in the formula must be taken from 1 and cannot be multipled again by 0.9. This is clearly stated in the table Notes for the calculations, but repeated discounts abound in the actual calculation-the results are too small to carry when something goes wrong.

 

2 The fire protection conditions and the general security conditions must be counted separately and taken with a large value. Because the load composition of these two conditions is completely different, and fire load input and non-fire load removal during fire cannot be simply superimposed.


This is also why a complete calculation book must be a "three tables": a fire load meter, a safe load meter, and a capacity calculation book.


What size genset do you need power sizing formulas and commn pitfalls


IV. Step 2: Three Capacity Algorithms


Algorithm 1: According to stable load (SC1)


S _C1 = (a * P_ S) / (a_s * cosf)


paramrtermeaningvalues taken
P_ Scalculated power(KW) for the load of the generatorload statistics indicate
H_ Sintegrated load efficiencygeneral 0.82~0.88
cos Ф
generator rated power factorgenerally use 0.8
aload synchronization rateif the mean coefficient has been calculated, then take


The physical significance of this formula is straightforward: the force divided by (efficiency × power factor) translates into the apparent capacity that the generator needs to output.


Algorithm 2: Start by maximum motor (SC2, peak load)


S_C2 = ((P_Σ - P_m)/(η_Σ) + P_m · K · C · cosφ_m)/(cosφ)


parametermeaningvalues taken
 P_mMaximum single or group motor frontal fixed power (kW)The project was determined
cosφ_m)/(cosφ)Motor start rated power factorGenerally take 0.4
KFull pressure start times of electric motorSee the table below
CThe starting method factor of an electric motorSee the table below


The value of C is linked to the starting mode:


The mother wire allows the voltage to dropK values
20%5.5
15%7
10%7.8


The value of C is linked to the starting mode:


how to startC value
Start with full pressure1.0
Y-Δ start0.33
Self-coupled transformer 50% jerk head0.25
self-couple transformer 65%  jerk head0.42
self-couple transformer 80%  jerk head0.64


Algorithm 3: Allowable voltage drop by bus (SC3)


S_C3 = P_n · K · C · X''_d · ((1)/(ΔE) - 1)


parametermeaningvalues taken
 P_nThe Front and Fixed Power (kW) of the Motor Which Has the Greatest Effect on the Bus Voltage DropThe project was determined
X''_dTransient electroresistance of generatorsGenerally take 0.25
ΔEThe mother wire allows transient voltage to dropNo lift 0.25 to 0.3; There is an elevator 0.2


The algorithm measures voltage mass, not heat capacity. Article 6.1.3 (4) of GB 51348-2019 gives hard indicators:


When there is an elevator load, when the maximum capacity cage electric motor is started at full voltage,the  genset mother line voltage should not be less than 80% of the rated voltage; When there is no elevator load, its mother line voltage should not be less than 75% of the rated voltage.


V. Complete calculation example: from 918kW to 1200kW


4.1 Fire load statistics (8 items counted)


serial numberdevice nameequiment capacity (KW)KCCosφCalculate active power kW
1Building A Tower Defense Equipment12510.80not counted
2Building B Tower Defense Equipment17510.80not counted
3Building C Tower Defense Equipment15010.80not counted
4Building D Tower Defense Equipment18510.80185
5Maximum underground fire protection zone14510.80145
6Adjacent to a fire zone8510.8085
7Fire pump room29010.80290
81 # 2 # substations (offset / offset)20*20.80.8016.00*2
9Woodworking Machinery150.80.8012.00
10Fire and Security Control Room4010.8540.00
11 Fired elevators in buildings1440.80.80115.20
12A weak electrical building200.80.8516.00
13Emergency Lighting (region-wide) 10010.90100.00


Total active power included = 1020.20kW, multiplied simultaneous coefficient 0.9 → P _ sigma 2 = 918.18kW


Here is a very professional processing logic worth learning: A, B, C three towers of defense equipment is not included, only included in the D building. Why? Because a fire can only occur in one building (a fire zone) when considered by the fire zone, the coefficient is already reflected in the "adjacent fire zone."The fire load cannot be added simply and must be adjusted according to the most unfavourable single point of fire." This idea is more important than the formula itself.


4.2 Protection load statistics (normal working conditions)


device name 

equipment capacity(KW)

KCCosφcalculate active power KW
Public lighting in the towers1200.80.9096.00
Security and Fire Control Room400.80.8532.00
1 # 2 # substations20*20.80.8016.00*2
Woodworking Machinery150.80.8012.00
A weak electrical building200.80.8516.00
 Communication room reserved1000.80.8080.00
Building elevator load4730.40.60189.20
The boiler room safeguard load154
0.80.80123.20
Medium water pump room / Supply water pump room and refrigeration room20*30.80.80

16.00*3

Emergency Lighting (region-wide)10010.90100.00
Emergency Lighting (region-wide)2140.80.80171.20


Total active power 899.60kW, multiplied simultaneous coefficient 0.8 → P _ sigma 1 = 719.68kW✓


4.3 Total load takes a large value


P_Σ = max(P_Σ1, P_Σ2) = max(719.68, 918.18) = 918.18 kW


The fire work conditions are greater, so they are configured by fire load. This conclusion is important: the capacity of backup power stations is often stuck by fire conditions, not by routine maintenance loads.


4.4 The three algorithms count one by one


1SC1 Steady Load


S_C1 = (1 × 918.18)/(0.82 × 0.8) = (918.18)/(0.656) = 1399.66 kVA


2 SC2 peak load (maximum motor Pm = 132kW, full pressure start K = 7, Y-Δ start C = 0.33, cosφm = 0.4)


S_C2 = ((918.18-132)/0.82 + 132 × 7 × 0.33 × 0.4)/(0.8) = (958.76 + 121.97)/(0.8) = 1350.91 kVA


3SC3 busbar allowable voltage drop (Pn = 132kW, X' ' _ d = 0.25, ΔE = 0.2, K = 7, C = 0.33)


S_C3 = 132 × 7 × 0.33 × 0.25 × ((1) / (0.2)-1) = 304.92 kVA


Take the maximum: S _ e = max (1399.66, 1350.91, 304.92) =1399.66 kVA






Follow Us

WeChat

WeChat

Contact Us

Mob.: +86 134 8102 4441

Tel.: +86 771 5805 269

Fax: +86 771 5805 259

E-mail: dingbo@dieselgeneratortech.com

WhatsApp: +86 134 8102 4441

Add.: No. 10 Kechuang Road, High tech Zone, Nanning, Guangxi, China

Get in Touch

Enter your email and receive the latest news from us.

Copyright © Guangxi Dingbo Generator Set Manufacturing Co., Ltd. All Rights Reserved | Sitemap Update cookies preferences | privacy-policy
Contact Us