The size of the generator is the easiest part of the backup power station design, and the one that is most likely to "hit your head" and go wrong.
The setup is small, and the fire pump jumps as soon as it starts; The gearing was large, and the long-term low load operation caused carbon deposits in the cylinder, oil dilution, and fuel consumption to soar. After a few years, the machine was scrapped. What's even more troubling is that many people don't even know what kind of "power" the machine they buy is labeled.
This article covers methods, formulas, parameters, calculations, and pits at once.
Ⅰ distinguish the four power types: this is the biggest pit of choice
The same generator set, the sample may write 1000kW, 1100kW, 1250kW three numbers, are not virtual standard - they refer to different power quotas.
According to Article 4.5.1 of JB / T 10303-2020, the unit output power quota is divided into four categories:
| power type | codename | operating method | yearly operating time | key constraints |
| continuous power | COP | a constant load operates continuously | unrestricted | run continuously each year with no time limit |
| base power | PRP | variable load continues to operate | unrestricted | average output ≤70%PRP in 24h cycle |
| time-limited operating power | LTP | run when the load limit is changed | ≤500h | up to 500h of operation at 100% LTP years |
| emergency backup power | ESP | run when the road linit is changed | ≤200h | average ≤70% ESP for 24h, generally≤1h each time |
This is the most common thunder on the scene: "1200kW" on the manufacturer's price list is probably ESP (emergency standby power). If you use it as a regular routine, it is equivalent to a long-term overload of 10% to 15% of the operation. In turn, you calculate the demand according to PRP, to choose an ESP 1200kW machine, the actual available capacity may only be 1000 kW.
Remember a sentence: the calculated capacity, be sure to ask the manufacturer "this number is COP, PRP or ESP," and use the same caliber.
JB/T 10303-2020 also adds a very pratical rule (Article 4.5.3) that when a unit is continuously operated beyond the specified time, its output power is converted into electrical power by 90% of the engine's specified power, but must not exceed the generator's rated power.
JB/T 10303-2020 4.2.2 clear: three-phase unit rated power factor 0.8 (lag), single-phase unit 0.9 or 0.1. So your KVA multiplied by 0.8 is KW, and this step is missing, and the power is 25% higher.
II. Algorithm Overview: Two steps to walk, three algorithms to take the larger
The entire configuration logic is actually two layers:
The normatuve basis is clear. GB 51348-2019 Article 6.1.3 (2) provides that:
1. Programme and initial design phase
The capacity of the emergency diesel generator set can be estimated at 10% to 20% of the total capacity of distribution transformers;
2. The construction plan design phase
3. The maximum capacity calculated by the following method should be determined: Calculate the generator capacity according to the stable load required to supply power; Calculated according to the maximum need for the activation of a single electric motor or group of electric motors; The voltage allowed to decrease by the generator's mother line when the motor is started and calculated;
4. Construction area of more than 1000 m2: 15~20W/m2;
5. Construction area below 10000m2: 10~15w/m2;
According to 10% to 20% of the distribution transformer capacity, the lower limit is taken from the large scale and the upper limit is took from the small scale.

The estimated indicators are used only for research and programme phase quotations. When the construction plan comes up, the load count must be done honestly, because the estimate does not reflect the decisive factor of "maximum single electric motor."
III. Step 1: How to calculate load statistics
The core is the need for coefficients:
P - js = K _ c * p _ e
Where P _ e is the equipment capacity (kW) and K _ c is the need factor. Divide it into inactivity by power factor, and then multiply it. Simultaneous coefficient get the total calculated load.
P _ s = K _ S * S P _ js
Two easily problematic details:
1 Need coefficients not to repeat discounts. If the mean coefficient has been multiplied by the load measurement, the "load mean coefficient α" in the formula must be taken from 1 and cannot be multipled again by 0.9. This is clearly stated in the table Notes for the calculations, but repeated discounts abound in the actual calculation-the results are too small to carry when something goes wrong.
2 The fire protection conditions and the general security conditions must be counted separately and taken with a large value. Because the load composition of these two conditions is completely different, and fire load input and non-fire load removal during fire cannot be simply superimposed.
This is also why a complete calculation book must be a "three tables": a fire load meter, a safe load meter, and a capacity calculation book.

IV. Step 2: Three Capacity Algorithms
Algorithm 1: According to stable load (SC1)
S _C1 = (a * P_ S) / (a_s * cosf)
| paramrter | meaning | values taken |
| P_ S | calculated power(KW) for the load of the generator | load statistics indicate |
| H_ S | integrated load efficiency | general 0.82~0.88 |
| cos Ф | generator rated power factor | generally use 0.8 |
| a | load synchronization rate | if the mean coefficient has been calculated, then take |
The physical significance of this formula is straightforward: the force divided by (efficiency × power factor) translates into the apparent capacity that the generator needs to output.
Algorithm 2: Start by maximum motor (SC2, peak load)
S_C2 = ((P_Σ - P_m)/(η_Σ) + P_m · K · C · cosφ_m)/(cosφ)
| parameter | meaning | values taken |
| P_m | Maximum single or group motor frontal fixed power (kW) | The project was determined |
| cosφ_m)/(cosφ) | Motor start rated power factor | Generally take 0.4 |
| K | Full pressure start times of electric motor | See the table below |
| C | The starting method factor of an electric motor | See the table below |
The value of C is linked to the starting mode:
| The mother wire allows the voltage to drop | K values |
| 20% | 5.5 |
| 15% | 7 |
| 10% | 7.8 |
The value of C is linked to the starting mode:
| how to start | C value |
| Start with full pressure | 1.0 |
| Y-Δ start | 0.33 |
| Self-coupled transformer 50% jerk head | 0.25 |
| self-couple transformer 65% jerk head | 0.42 |
| self-couple transformer 80% jerk head | 0.64 |
Algorithm 3: Allowable voltage drop by bus (SC3)
S_C3 = P_n · K · C · X''_d · ((1)/(ΔE) - 1)
| parameter | meaning | values taken |
| P_n | The Front and Fixed Power (kW) of the Motor Which Has the Greatest Effect on the Bus Voltage Drop | The project was determined |
| X''_d | Transient electroresistance of generators | Generally take 0.25 |
| ΔE | The mother wire allows transient voltage to drop | No lift 0.25 to 0.3; There is an elevator 0.2 |
The algorithm measures voltage mass, not heat capacity. Article 6.1.3 (4) of GB 51348-2019 gives hard indicators:
When there is an elevator load, when the maximum capacity cage electric motor is started at full voltage,the genset mother line voltage should not be less than 80% of the rated voltage; When there is no elevator load, its mother line voltage should not be less than 75% of the rated voltage.
V. Complete calculation example: from 918kW to 1200kW
4.1 Fire load statistics (8 items counted)
| serial number | device name | equiment capacity (KW) | KC | Cosφ | Calculate active power kW |
| 1 | Building A Tower Defense Equipment | 125 | 1 | 0.80 | not counted |
| 2 | Building B Tower Defense Equipment | 175 | 1 | 0.80 | not counted |
| 3 | Building C Tower Defense Equipment | 150 | 1 | 0.80 | not counted |
| 4 | Building D Tower Defense Equipment | 185 | 1 | 0.80 | 185 |
| 5 | Maximum underground fire protection zone | 145 | 1 | 0.80 | 145 |
| 6 | Adjacent to a fire zone | 85 | 1 | 0.80 | 85 |
| 7 | Fire pump room | 290 | 1 | 0.80 | 290 |
| 8 | 1 # 2 # substations (offset / offset) | 20*2 | 0.8 | 0.80 | 16.00*2 |
| 9 | Woodworking Machinery | 15 | 0.8 | 0.80 | 12.00 |
| 10 | Fire and Security Control Room | 40 | 1 | 0.85 | 40.00 |
| 11 | Fired elevators in buildings | 144 | 0.8 | 0.80 | 115.20 |
| 12 | A weak electrical building | 20 | 0.8 | 0.85 | 16.00 |
| 13 | Emergency Lighting (region-wide) | 100 | 1 | 0.90 | 100.00 |
Total active power included = 1020.20kW, multiplied simultaneous coefficient 0.9 → P _ sigma 2 = 918.18kW
Here is a very professional processing logic worth learning: A, B, C three towers of defense equipment is not included, only included in the D building. Why? Because a fire can only occur in one building (a fire zone) when considered by the fire zone, the coefficient is already reflected in the "adjacent fire zone."The fire load cannot be added simply and must be adjusted according to the most unfavourable single point of fire." This idea is more important than the formula itself.
4.2 Protection load statistics (normal working conditions)
| device name | equipment capacity(KW) | KC | Cosφ | calculate active power KW |
| Public lighting in the towers | 120 | 0.8 | 0.90 | 96.00 |
| Security and Fire Control Room | 40 | 0.8 | 0.85 | 32.00 |
| 1 # 2 # substations | 20*2 | 0.8 | 0.80 | 16.00*2 |
| Woodworking Machinery | 15 | 0.8 | 0.80 | 12.00 |
| A weak electrical building | 20 | 0.8 | 0.85 | 16.00 |
| Communication room reserved | 100 | 0.8 | 0.80 | 80.00 |
| Building elevator load | 473 | 0.4 | 0.60 | 189.20 |
| The boiler room safeguard load | 154 | 0.8 | 0.80 | 123.20 |
| Medium water pump room / Supply water pump room and refrigeration room | 20*3 | 0.8 | 0.80 | 16.00*3 |
| Emergency Lighting (region-wide) | 100 | 1 | 0.90 | 100.00 |
| Emergency Lighting (region-wide) | 214 | 0.8 | 0.80 | 171.20 |
Total active power 899.60kW, multiplied simultaneous coefficient 0.8 → P _ sigma 1 = 719.68kW✓
4.3 Total load takes a large value
P_Σ = max(P_Σ1, P_Σ2) = max(719.68, 918.18) = 918.18 kW
The fire work conditions are greater, so they are configured by fire load. This conclusion is important: the capacity of backup power stations is often stuck by fire conditions, not by routine maintenance loads.
4.4 The three algorithms count one by one
1SC1 Steady Load
S_C1 = (1 × 918.18)/(0.82 × 0.8) = (918.18)/(0.656) = 1399.66 kVA
2 SC2 peak load (maximum motor Pm = 132kW, full pressure start K = 7, Y-Δ start C = 0.33, cosφm = 0.4)
S_C2 = ((918.18-132)/0.82 + 132 × 7 × 0.33 × 0.4)/(0.8) = (958.76 + 121.97)/(0.8) = 1350.91 kVA
3SC3 busbar allowable voltage drop (Pn = 132kW, X' ' _ d = 0.25, ΔE = 0.2, K = 7, C = 0.33)
S_C3 = 132 × 7 × 0.33 × 0.25 × ((1) / (0.2)-1) = 304.92 kVA
Take the maximum: S _ e = max (1399.66, 1350.91, 304.92) =1399.66 kVA
Quicklink
Mob.: +86 134 8102 4441
Tel.: +86 771 5805 269
Fax: +86 771 5805 259
E-mail: dingbo@dieselgeneratortech.com
WhatsApp: +86 134 8102 4441
Add.: No. 10 Kechuang Road, High tech Zone, Nanning, Guangxi, China